Reynaers CF 68 Biofld Door Installation Guide

 

TOOLS

The following tools will be required for the correct installation of this door set:
• Large spirit level or laser level
• Tape measure
• Cordless drill/driver
• Phillips screwdriver (PH2)
• Power hammer drill
• A selection of drill bits (HSS and SDS)
• A selection of Allen keys
• Glazing paddle
• Assortment of glazing packers and packing shims
• Glass cleaner (to assist in wedge gasket installation)
• Suitable fixing for securing the frame to the opening
• Hammer
• Rubber mallet
• Quick release soft face clamps
• Glass suction pad lifter
• Work bench or trestles

 

STEPS 

  1. Assembling outer frame
  2. Installing the outer frame
  3. Installing door leafs
  4. Glazing
  5. Adjustment
  6.  

https://www.hnsaluminium.co.uk/upload/files/2019/11/reynaers-cf-68-bifold-door-installation-guide.pdf

 

SHARE: